Friday 9 December 2011

Mineries Halt takes shape.

The basic structure of a platform and waiting shelter for Mineries Halt have now been assembled. The platform design is similar to Bason Bridge, Somerset and the shelter is broadly based on Cole, with features from other similar shelters. The fencing will also be based on Cole, which used reclaimed bullhead rail for the posts. There's still lots of tidying up, detailing, and painting to be done!



No comments:

Post a Comment