Friday, 1 August 2014

Progress on the Circuit

4th May 2014.

I laid the second track on a 4m section of viaduct today, as well as various other jobs. Finished the day with the camera wagon. The results can be seen at  https://www.youtube.com/watch?v=yF4UvEPBMWA&feature=youtube_gdata

First through the Barn

29th April 2014.

Today I had enough movable track cassettes to run a train in one side of the Barn and out of the other side. First, a goods train was marshalled on the lawn viaduct - the lowest point of the railway.


The train then climbed the 1 in 50 through the rose bed, into the north side of the Barn, and across the marshalling table. The track included a cassette made from a length of MDF with two pieces of aluminium L angle 16.5mm apart. The other cassettes were Peco flexitrack mounted on thinner MDF to achieve the same railhead height.




The train finally emerged from the south side of the Barn, and climbed the remainder of the 1 I 50 bank to the summit.

The final picture shows the south portal of the Barn in context with the greenhouse and water butt.


Wednesday, 16 July 2014

Winter Work.

 

29th April 2014.

Most of the work during the winter and spring has concentrated on the raised section through the rose bed and into the Barn. The Barn is our name for the shed on the left of the picture, with a double-pitched roof like a dutch barn. The gap in the viaduct houses a light-weight removable section of viaduct on running days. To the left of it in the picture, the line rises at 1 in 50 from the removable viaduct, while curving first to the left through 45 degrees, then right through 135 degrees through a watertight hatch into the Barn. The sharpest curve is 5ft radius.


A panoramic view of the north viaduct and the elevated section through the rose bed.
 
 
 
A Dänenholzbahn 2-10-2T descends from the Harz mountains, past the lake and approaching the viaduct.
 

The Dänenholzbahn train approaches the north entrance to the Barn.
 

The transition from Peco to C&L Finescale flexi-track. The difference is remarkable!
 
The uphill track (the only one laid at present) from the removable section to the Barn, has been experimentally fitted with DCC Concepts Powerbase steel plates. To maximise their effect, C&L Finescale flexi-track has been used for this section, as its height from sleeper base to rail head is 1.5mm less than Peco. This might not sound much, but can make a significant difference to magnetic attraction, which falls off very rapidly with distance. 
 
The only test of Powerbase so far was to fit a single magnet on a Bachmann S&D 2-8-0. Before, it could not manage more than six 150g coaches on 1 in 50. With Powerbase it pulled the equivalent of 9 or 10. It was a very rough test though, more controlled tests will come!

I don't normally go for "foreign", but last year visited the wonderful Harz metre-gauge railways in north Germany, and travelled in 4-wheeled end-balcony coaches behind massive 2-10-2T locos. These H0 standard-gauge coaches and loco look remarkably similar, and I couldn't resist them!

The Barn has a 2' wide shelf across the back across which runs the railway on movable sections if track. This allows locos or trains to be marshalled, changed or turned by sliding the track modules around on the shelf. There is another entrance/exit the other side of the Barn. The scheme is as yet untried in regular service, and it remains to be seen how well it works in practice, though I have done experimental trails and the principle seems to work. Under the shelf is storage space for the two removable viaducts and tunnel liner. The rest of the space is storage shelves, DCC electronics, and a chair!

The first three viaduct arches are cut out. It's a very messy and time-consuming job, so as the remainder will be largely obscured by flowers and shrubs, the painted arches seemed a good compromise, and are likely to be stronger too. You will have noted that the vertical and horizontal blocks are identical, each being half a lightweight building block. This minimised the amount of cutting and carving required!

I am now within days of achieving the milestone of running a train round a complete circuit, Barn to Barn, albeit with some single-track sections still to be doubled. They must be fine days though, so it might be a week or two.
An engineers' inspection train awaits clearance to exit the Barn through the north entrance.


Live 00 Scale Vegetation

18th January 2014.

Did some leaf clearing today, and ran a loco over most of the track. There is quite a bit of vegetation growing in the quarry now. It's a pity te moss growing here can't be trained to grow where it's wanted, and it would be as useful as "static grass".

The test loco runs down the 1 in 14 in the quarry. Normally, only small shunting locos are permitted here.

Friday, 1 November 2013

A Tree on the Track

On Monday 28th November 2013, we woke up to find a slight setback in the garden railway development. A large pine tree has shed its upper half onto our 200 year old wall and part of the garden. An apple tree had disappeared completely, but we hoped that the railway might just have been protected by the wall.
Looking down the bank towards the fallen tree.
 
Looking up the bank towards the fallen tree.

The fallen tree was removed on the following Friday morning. I have to say that the team from Elmbridge council did a splendid job, and were careful to avoid any further damage to the wall or the railway.

The tree being cut up and removed
Within an hour of the team arriving to cut up and remove the tree, I had the first train running. The kink in the foreground of the picture was the only obvious damage to the railway. The wall wasn't so lucky.....

The first train after removal of the tree.

Friday, 18 October 2013

Fitting DCC Decoder to a Bachmann Collett 0-6-0 with Cast Metal Tender

Going through my Dad's old model railway bits, I found a K's white-metal kit for a Dean Goods 0-6-0. The loco was incomplete, but one of the Collett 0-6-0's on our local branch line in the 1960s was fitted with the tender from a Dean Goods, and I had a spare Bachmann Collett 0-6-0. This model's destiny suddenly changed to one with a future as 2218.

This particular Bachmann loco was unusually a very poor runner, moving fitfully and stalling frequently. Adjusting the pick-up contacts had not resulted in any improvement, so I experimentally (ie as an unmaintainable lash-up) fitted pick-ups in the tender and two sprung electrical contacts between the tender and loco. But it was cumbersome and difficult to wire, and didn't make it run any  better, so it was removed. And it has sat in a box for a couple of years waiting for another idea.

Now that the garden railway uses digital control (DCC), I have been gradually fitting the appropriate locos with decoders. The older Bachmann Colletts have no space for a decoder in the loco without cutting metal, but it was clear that the floorless white-metal tender could easily be made to house a decoder with four linking wires to the loco. To alleviate the inconvenience of having them permanently coupled, I would use a connector. I produced a design and proceeded with an experimental assembly. Wiring was again extremely difficult, and the force required to separate the connector was impossible to apply where it was needed. So back to the drawing board again.

It then struck me that if the decoder was fitted to the loco with wires of the right length and slid into the tender during coupling, the difficulties would all be resolved. Wiring would be more straightforward (there would be none permanently in the tender), the loco and tender would be easily separable, and no connector would be needed.

First I made an insulated box to take the decoder. I used 30 thou plastikard. It must be wide and high enough to easily fit the decoder, and reasonably long. About twice the length of the decoder (if possible) seems about right. The bar across the bottom end (end A in the first photo) is to stop the decoder falling all the way through while still allowing air flow, and the packing under the entry end (end B) is as thick as is necessary to get the entry angle correct. To clear the wheels, the overall width should not be more than about 12mm for 00, which restricts the choice of decoders. I used a TCS M1, which comes fitted with a protective insulating sleeve. If you use an unsleeved decoder, you should fit a sleeve for protection.
 
The decoder box before installation in the tender.
The box was then fitted in the tender and held in place with a suitable adhesive. Check that the sleeved decoder and cables slide in easily, and the wheels turn freely.
  
The decoder box in place under the tender.
Now remove the loco body by undoing the two screws at front and rear of the chassis. Then loosen the central chassis screw, and carefully remove the keeper plate and wheelset from the main chassis block. To fully separate them, you need to cut the red and black wires leading to the motor. 
 
The three main chassis sub-assemblies.

Quickly and carefully (to avoid melting plastic), unsolder the red and black wires both at the motor and at the metal contact strip attached inside the keeper plate at C in the picture below. Drill two tiny holes each side of the tender hook, each just big enough to take one decoder wire. Cut short and sleeve the unused decoder wires (blue, yellow, white). Fit any protective sleeving you think necessary to protect the wires from chafing. Feed the decoder wires through the holes, with red and black closest to the metal contact strips inside, to which they will be soldered, and red on the right from behind when the wheels are down. Allow them to slide in and out while trying the position of the decoder until it is about half-way down its box with he tender coupled. When you are happy that it is just right, unthread the orange and grey wires to avoid damage, then trim the red and black wires to length and solder carefully to the contact bars.
 
Part of the keeper plate showing solder terminals C and tender hook. 

Re-thread the orange and grey wires into the keeper plate, then thread them through the square hole in the main chassis block, carefully re-fit the wheels and keeper plate ensuring the six contacts are correctly located behind the wheel rims, and tighten the middle screw. Run the orange and grey wires up to the motor terminals using the same route as the old red and black wires, trim and solder in place. Note that space is very tight, so correct routing of the wires is critical to avoid damage.
 
The finished "decoder tail".

You can now check there are no short circuits, especially from red to black or orange to grey. If ok, test on the track, and if still ok, refit the body and tighten the front and rear screws.
 
Loco and tender coupled together. The wires will be painted black.

A similar principle could be applied to other locos with limited space for a decoder, providing (a) it has a tender and (b) the tender has a suitably located space for a decoder box. Unfortunately, this rules out the majority of limited-space locos, which are tank engines.
 
The following day, the engine was given a test run in the garden. The heavy rain showers  meant that the trackbeds were saturated, but she still managed 8 coaches up the 1 in 50, with only occasional short bouts of slipping. The actual total weight of the coaches used was 1020g, which on a 1 in 50 gradient requires, ignoring friction losses, a pulling force (or tractive effort) of 20g. Scaled up 76 times to full size (i.e. multiplied by 76 cubed because weight or force is proportional to volume) gives a figure of about 20,000lb. For comparison, the quoted theoretical tractive effort for a real engine of this class is 20,155lb - a pretty good correlation!
 
2218 under main line test. She still needs some painting, detailing and renumbering.
A bonus result of this task was that when I removed the keeper plate, I found that the gears, axles, and sprung centre wheelset bearing were all packed with a thick grease, most of which had hardened to the consistency of candle-wax. It's not surprising it was a poor runner! As much as possible of the grease was scraped out, a little light oil applied, and it is now one of the sweetest of runners.
 
 



Saturday, 14 September 2013

Planting for a 00 Garden Railway.

My garden railway has been built based on the principle that it will blend in with the garden, and the trains running on it will "look right". It would be impractical to add 00 scale scenery as I would with an indoor layout, so it is important to choose the right vegetation around the railway.

The first place I looked was in the "Alpines" section of the garden centre. The plants in this section are generally small and slow-growing, so they shouldn't dwarf the trains, and shouldn't require too much maintenance. One of the early finds is described below.

Arenaria balearica is a low, spreading plant with tiny leaves. It flowers on short stems in early summer, and retains its leaves all year. It likes well-drained soil, sun or part shade, and is  drought-resistant. It is ideal for providing ground cover close to ground-level trackwork, reducing the chance of earth splashing over the rails when it rains.


Arenaria balearica
I have just found this post sitting waiting patiently as a "draft post". Although it is a bit shorter than originally intended, it might be useful to someone, so her it is! Perhaps I will continue the topic in a later post.