Thursday, 23 February 2012

Railway Mouse

Today was so sunny and warm, I just had to spend a few hours in the garden. I set to attacking some of the out-of-control laurel trees which were inpeding progress on Garden Railway Phase 2. The first picture shows what was achieved. In the immediate foreground, the existing track emerges from the tunnel and starts curving to the left. It will continue this curve on an embankment, until it is parallel with the fence. It will then run straight, on a concrete lintel supported by the two perforated blocks. The whole of this section is now clear of roots, the compost bin has been emptied and removed, and the blocks and hardcore are in place. All I need now is some concrete and a lintel, and tracklaying can begin!

The construction site for the start of Garden Railway Phase 2.

While I was digging roots, I saw out of the corner of my eye a movement in the rockery, I looked again, and saw a wee mouse peering out of one of the gaps between the rocks. I think he's been hibernating there, as I noticed the piles of earth from digging his tunnels back in the Autumn. In today's warm weather, he couldn't resist coming out!

The railway mouse.


Sunday, 19 February 2012

Winter Project Progress Report

As the signs of Spring are starting to appear in the world outside, it is perhaps time to offer a progress report on the Winter layout-building project.

The baseboard structure is complete, and the trackwork operational, though the ballasting needs tidying up and the refuge siding turnout has gone sticky due to a warped actuator bar. The first stages of the grass, earth, wall, road and fencing are in place at the front of the layout, but need a lot mor work. The scenery behind the railway has barely started other than bits of the structure. The level crossing design has been chosen and the components purchased. The crossing-keeper's cottage has been designed and the basic structure assembled, and the design of the quarry building has been established.

That amounts to a lot of work, especially since most of what I have done so far was new ground for me, so I had to learn how to do it first. However, there is even more work still to do, so I suspect I'll still be working on it next winter!

Still a lot to do, but a lot of the basic stucture us there now.

The pub is only a place-holder. Colours need subduing, especially the grass!

Sunday, 12 February 2012

The right sort of snow.

FRIDAY, 10th JANUARY 2012

More snow this morning, and this time it was cold and dry, and the snow-plough cut through it perfectly! The picture shows the train most of the way through the first deep drift, and just about to break out of the other side. It then cleared the whole of Quarry Bank up to the tunnel.

A Jinty and an 8F propel the plough through the snow with the greatest of ease.

See also the video at  http://youtu.be/hNQc-qouvN4.

Monday, 6 February 2012

S'no Use Complaining.

The garden railway snow-clearing train battles its way through 10' snowdrifts at the foot of Quarry Bank. The snow was wet and heavy and conditions were deteriorating. Shortly after this picture was taken, further efforts were abandoned.

A 9F 2-10-0  puts its weight behind the Garden Railway snow plough.

Monday, 9 January 2012

S'no Time like the Present.

So far, the winter has been pretty mild, but the Garden Railway authorities do not wish to be caught unawares! So it was that a snowplough was bought on the surplus market, and after servicing was immediately sent on a gauging run between the viaduct and the tunnel.

An 8F runs up Quarry Bank with the snowplough, freshly serviced in preparation for the winter snows.

The snowplough is one of the fine models produced by Flangeway (www.flangeway.com). However, as I anticipate using it on real snow if we get the "right sort of snow", I added extra weight to bring it up to a more stable 108g.

Saturday, 7 January 2012

Nuclear Winter

Today was unusually warm and dry, to the extent that even the lawn was dew-free. An ideal day, then, for a mid-winter check of the garden railway. I didn't have too much time, so only the section from the viaduct to the tunnel received the attention of the track-cleaning rubber and (for the quarry turnout) the WD40 and toothbrush. A short train was then summoned to run up and down a few times. It ran well, but did bring to light one fault; some of the rail joints around the tunnel didn't get electrical jumpers soldered across them before the winter set in, and after a few months of corrosion, the rail joiner is no longer providing electrical contact. Another job for the Spring.

A BRCW type 2 (/Crompton / class 33) powers past the quarry with a
mildly anachronistic Hinckley Point - Sellafield nuclear flask train.

Another useful job done today was to upload some 1960s pictures to Flickr: "On Shed" at http://www.flickr.com/photos/fungus-mcbogle/sets/72157628764868833/, and "Industrial Railways" at http://www.flickr.com/photos/fungus-mcbogle/sets/72157628751245737/.

Sunday, 1 January 2012

Mineries Halt

At last the platform is starting to look its part, now that the fencing is complete and the whole thing undercoated. As always, the photograph highlights the shortcomings; the posts are far from vertical, there's still a lot of detail painting and weathering to do, the track is still not ballasted and fish-plated, and the engine's weathering has some missed bits. I'm pleased with the general effect though, if not the rate of progress!

W.R. 0-6-0 no. 3210 coasts to a halt at Mineries with the 13.22 Priddy -
Masbury Junction, on an Autumn day in 1964.
... and the next day, the fencing and platform edge have been painted. I still haven't steeled myself to have another go at fitting the fishplates so that I can get on with the ballasting and then the rest of the scenery. I have however printed a more appropriate backdrop!

The DMU in the next picture is an old Lima unit from my son's train set. He bought it second-hand at a swapmeet about 15 years ago, with his own saved-up money. The headboard, fixed temporarily in place with Blutack, was made with the help of Paint Shop Pro from a picture of a Birmingham suburban "special" I helped organise many years ago.

Following the success of their 1968 excursion around Birmingham, the BUTS's
 next project was to run a similar train over some closed and freight-only routes
in Somerset. The train is seen returning along the branch from Priddy, which at
 that time still served the quarries at the St. Cuthberts and Waldegrave Mineries.

In the Spring of 1964, a "borrowed" 8F returns from the Mineries quarry sidings with a ballast train.

The quarry shunter "Penelope Jane" ventures out onto BR metals.


Out of interest, here is the original headboard on the 1968 Birmingham University Transport Society's train in the closed station at Redditch.

The 1968 BUTS special at Redditch.